We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for Preliminary investigation.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

Preliminary investigation - List of Manufacturers, Suppliers, Companies and Products

Preliminary investigation Product List

1~5 item / All 5 items

Displayed results

If there is asbestos in the preliminary survey, use the special flexitank for Asbestos Level 3!

A professional shop that handles long items such as slate boards that can be packaged and transported in their original form, including the "Relay Bag Long Type" and the "Asbestos Label Type" for rubble.

Recently, there has been a surge in inquiries from demolition, renovation, waste disposal, electrical, and equipment construction industries regarding the asbestos level 3 dedicated flexible containers, following the results of asbestos pre-investigations indicating the presence of asbestos during demolition work. For long items such as slate boards, we offer the "Relief Bag Long Type": ◆ Thanks to the patented belt structure, lifting does not require skilled techniques for load balance adjustment, making hoisting and loading simple and speedy! ◆ Comes with labels indicating "Asbestos-containing industrial waste" and "Handling precautions," available in three sizes: [6 feet], [8 feet], and [10 feet]! For rubble, we provide the "Asbestos Indication Type": ◆ Displays "Asbestos-containing industrial waste" and "Handling precautions"! ◆ Available in two types: a 1000-liter type that can hold large debris and a compact 100-liter type suitable for manual handling! ◆ The interior is laminated, and the input section is sealed to ensure airtightness! Additionally, we offer double-packaged polyethylene sheets, inner bags, and asbestos indication labels. When the asbestos pre-investigation results indicate the presence of asbestos, please leave it to the "Asbestos Level 3 Transport Container Pro Shop" Interaction!

  • Packaging materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Asbestos building material analysis preliminary survey

Asbestos qualitative analysis preliminary survey (can conduct on-site investigation, sampling work, and analysis)

Nisshin Environment has extensive experience in asbestos analysis and surveys, so please feel free to consult us not only about air and building materials (covering 6 types) but also about natural minerals. - Preliminary drawings and visual inspections for asbestos in buildings - Asbestos analysis in building materials - Asbestos measurement in the air (measurements at removal work sites are excluded) For more details, please contact us or download the catalog.

  • Contract measurement

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Asbestos Pre-Investigation | Nationwide Compliance with Qualified Personnel Requirements [98 People]

From the construction starting on October 1, a pre-investigation for asbestos by qualified personnel will be mandatory. We can provide one-stop nationwide support from investigation to countermeasures!

From October 1, when carrying out work such as the demolition of buildings, it is necessary to conduct a preliminary survey by a "Building Asbestos Containing Material Investigator." Our company has placed 98 qualified investigators (as of September 2023) from Hokkaido to Kyushu, and we have established analysis laboratories with nationally designated qualified personnel in four locations across the country. We also have 22 specially qualified Building Asbestos Containing Material Investigators who can handle large-scale buildings. We provide a one-stop solution from investigation to countermeasures with a variety of remedial construction methods, including water jetting. We conduct document surveys, on-site surveys, sample collection, and analytical investigations in accordance with the law, and we use the "NS Clean Method (removal method)" technical review certification to suppress dust generation during the removal of sprayed materials, ensuring a safe approach. [Recommended for those who:] ■ Plan to carry out demolition or renovation work but do not have the necessary qualified personnel for the preliminary survey ■ Have sites across the country but want to consolidate the contact point for preliminary surveys ■ Want to expedite remedial work based on survey results *For more details, please download the PDF or feel free to contact us.

  • Other environmental analysis equipment

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Asbestos Pre-Investigation | Compliance with Mandatory Qualified Personnel Requirements [Over 100 Qualified Personnel]

Is the preliminary survey for asbestos completed for that construction? We provide one-stop nationwide support from investigation to countermeasures.

When carrying out demolition and related work on buildings, a preliminary survey by a "Building Asbestos Containing Material Investigator" has become mandatory. Our company has placed over 100 qualified investigators across various locations from Hokkaido to Kyushu, and we have qualified personnel at four major analysis centers nationwide to respond to these needs. We also have 21 designated Building Asbestos Containing Material Investigators capable of handling large-scale buildings. We provide a one-stop solution from investigation to countermeasures with a variety of measures, including water jet technology. We conduct document surveys, on-site surveys, sample collection, and analytical investigations in accordance with the law, and we utilize the "NS Clean Method (removal method)" for the removal of sprayed materials, which suppresses dust generation with reliable technology. [Recommended for those who] ■ Plan to carry out demolition or renovation work but do not have the necessary qualified personnel for the preliminary survey ■ Have sites nationwide but want to consolidate the point of contact for preliminary surveys ■ Want to expedite countermeasure work based on survey results *For more details, please download the PDF or feel free to contact us.

  • Contract Inspection

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Asbestos preliminary survey

We will conduct a "preliminary survey of asbestos-containing building materials" that is necessary before carrying out demolition and renovation work, focusing on wooden single-family houses.

There are four points regarding the preliminary asbestos survey for residential businesses. 1. Nationwide survey capability Asbestos-containing building material surveyors will conduct surveys nationwide. *As of October 2023, surveys by asbestos-containing building material surveyors are mandatory.* 2. Fast delivery within one week Delivery will be made within one week from the survey date. This includes document surveys based on design documents and "presumed containing surveys" conducted on-site. *Delivery times may vary if sample collection and analysis are involved.* 3. Sample collection and analysis available Please provide instructions on-site for sample collection in your presence. Delivery times will be communicated based on the number of collection points. *Analysis is limited to cases where samples are collected by our company.* 4. Electronic report (※) based on the reporting screen For demolition and renovation work of a certain scale or larger, electronic reporting of survey results is required. *Asbestos preliminary survey result reporting system: Prior issuance of a G Biz ID is required for use.*

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration